
The pull-out
The wet-room checklist
Three questions from Belle, five checks from Ben, for the rooms that get wet. Print it or keep it on your phone.
Answer my three before anyone quotes a wet room.
- 1
Which rooms get wet, and how often?
- Bathrooms, every day
- The kitchen, every day
- The service yard
- By the windows, in storms
- 2
Where does the rain come in when a storm hits?
- The living room windows
- The kitchen window
- The service yard
- Nowhere so far
- 3
Who in your home needs a floor that isn't slippery when wet?
- An older parent
- A toddler
- A dog
- Everyone
Tick my five before you pay anyone.
- 1
If the bathroom floor is replaced: waterproofing screed and a membrane turned up at least 150 mm go down first, and the quote says so.
- 2
In a block less than 3 years old: overlay only, no replacing the toilet finishes.
- 3
If the bathroom floor is replaced: the quote includes a water test on the finished floor, by you and your contractor.
- 4
The quote says any overlay leaves the floor trap untouched.
- 5
The quote says where the vinyl stops, and which edges near water get a flexible sealant.
- Rooms staying tiled
- Kitchen
- Bathrooms
- Service yard
- Edges to seal
- By the sink
- Under the windows
- At the bathroom doors
- Water test date
- Floor traps checked
- Yes, untouched
- Not yet
- Block completion date
- Quote total, supplied and laid
Eight ticks, then sign.
Notes and sources (5)
HDB, Renovation: important information · checked 30 Sep 2026
- "Pre-packed waterproofing screed and waterproofing membrane must be used in bathrooms/ toilets before laying new floor finishes. Membrane should be upturned (minimum 150mm) against the walls, kerbs, and pipes"
- "The toilet floor and wall finishes provided by HDB/ developer must not be replaced for a period of 3 years from the completion date of the block… You can, however, lay new toilet floor finishes over the existing floor finishes using adhesives."
- "You and your renovation contractor must conduct a water test on the bathroom/ toilet upon completing the replacement of floor finishes"
HDB, Building works guidelines · checked 30 Sep 2026
- Laying of floor finishes over existing floor finishes using adhesive only: "No tampering of the floor trap is allowed".
Karndean, 2G Rigid Core installation guidelines (Australia and New Zealand) · Aug 2023
- In potential wet areas, "a flexible acrylic or flexible low modulus neutral cure silicone sealant may be used" to protect the expansion gap from water.